What are the steps to install a septic system?
A septic install has five steps: site assessment, design, filing, construction and certification.
The site assessment checks the soil, the slope and the distance to wells and water. The design sizes the tank and the field from the house's daily flow, which depends on the number of bedrooms and the floor area. The authorized person files the plans with the health authority. Then the crew digs, sets the tank, builds the field and covers it. Last, the system is certified and the owner gets the paperwork and a maintenance plan.
How many days does it take to install a new septic system?
The physical install on a normal residential lot often takes a few days once the design is filed. Rock, a wet site, a mound or a treatment unit add time.
The steps before it take longer than the digging. Allow time for the site assessment, the design and the filing. In the Kootenays, frozen ground also stops excavation for part of the year, so spring to fall is the main season.
How deep does a septic tank need to be in the ground?
A septic tank goes in no deeper than its manufacturer allows. The lids sit at the surface or just above it, so the tank can be found and pumped.
BC's Standard Practice Manual treats more than about 90 cm of soil over the lid as deeper than normal. In that case the tank needs taller risers to bring the access up to grade. The field itself sits much shallower, under a thin cover of soil.
What is a septic bed?
A septic bed is the part of the system where the treated effluent soaks into the ground. It is also called a septic field, drain field or dispersal area.
The tank settles out the solids. The liquid then flows or is pumped to the bed, where it spreads through pipes into gravel or sand and down into the soil. The soil finishes the treatment. That is why the soil type and depth matter so much in the design.
A bed can be a set of trenches, a single wide bed, a raised sand mound or an at-grade bed. The site decides which one.
What type of septic system lasts the longest?
The system that lasts longest is the one that suits its site and gets regular maintenance. A field built in the wrong soil, or overloaded with solids, fails early whatever its type.
Good design keeps enough unsaturated soil under the field. Regular tank pumping keeps solids out of it. Both matter more than the brand of tank.
What is the most common cause of septic system failure?
The most common causes are a design that does not suit the site and poor maintenance. The US EPA names soils that cannot treat the effluent, steep slopes and high groundwater as the main design problems.
On the maintenance side, a tank that is not pumped lets solids flow on and clog the field. Too much water at once, wipes and grease down the drain, a garbage disposal, vehicles driving on the field, tree roots and surface water pooling on the bed all shorten its life.